This roadmap is a scope sequence for buyers who have not closed geometry, loads, or document requests. NorthAxis Sourcing uses it to keep an alternative steel system from being accepted on a brand name alone. It is not an environmental pledge and not a plant audit.

Send Project Requirements

Still open until written

  • Use
  • Dimensions
  • Loads
  • Jurisdiction
  • Quantity
  • Destination

Specification tabs before an alternative is accepted

Switch the tab. Each table is a request list, not a completed design and not a price.

Building footprintLength and width in ft or m, supplied by the buyer.
Eave height and clear spanState both. A 60 ft clear span with an 18 ft eave is an illustration of units, not a recommended building.
Bay spacingName the bay if a standard module is acceptable, or mark the span as custom.
OpeningsDoor and window sizes change girt layout. List them with the frame.

Checklists to attach to the inquiry

These are not downloadable certificates. Copy the group into the requirement form. Nothing here is a file this desk hosts as a controlled document.

  • Primary frame type and secondary framing: purlin and girt spacing
  • Insulated metal panel or other roof and wall assembly
  • Thermal transmittance or R-value the climate discussion needs
  • Fire-resistance rating if the occupancy requires one, otherwise mark not requested

Questions grouped by decision

Geometry still open

What if clear span and eave height are still estimates?

Label them as estimates and give the unit. Ask suppliers to state the assumption they priced. An estimate is not permission to treat two different spans as equal.

When is a standard bay the wrong shortcut?

When door width, crane aisle, or a required clear span will not fit the published bay. Custom engineering then needs its own calculation set. The roadmap records the choice. It does not rank the fees.

Accepting an alternative

What should be verified before a brand-led search is dropped?

The substitute system’s geometry, loads, enclosure, exclusions, and the documents that name that system. A similar photo is not verification. Compatibility with a referenced brand is not claimed.

Where do budget and preference sit?

Optional. Currency plus per-unit or whole-order basis. High-end, mid-range, budget, or undecided is a buyer preference about finish and service level. It is not a rating NorthAxis Sourcing has audited.

Three limits stay on this roadmap: missing jurisdiction blocks any code sentence; missing crane data blocks a crane-building comparison; missing scope labels block a total-price comparison. Continue at Building Options or Contact.

Request a scope review, not a slogan

Send the open rows. The desk will ask factories to answer the written scope and to show which lines they will not price.